2013 Hydro JetterThe cleaning crew lead worker will position the truck within two feet of the maintenance hole, on the downstream end of the sewer main being cleaned.
2012 Hydro JetterThe cleaning crew lead worker will position the truck within two feet of the maintenance hole, on the downstream end of the sewer main being cleaned.
2008 Hydro JetterThe cleaning crew lead worker will position the truck within two feet of the maintenance hole, on the downstream end of the sewer main being cleaned.
2004 Combination Vacuum TruckThe collection crew will clean the sewer main line using a hydraulic jetter, to accumulate debris in a maintenance hole – in this case, grease. The…
2012 Sprinter Video Inspection VanOro Loma’s Sprinter CCTV van’s longer, taller and thinner design provides more room for passing traffic when set up in the street, more room for…
2018 Video Inspection VanThe television inspection lead worker will position the van approximately 3 feet from the maintenance hole being accessed. The camera can go in any…
1996 Continuous RodderThe cleaning crew lead worker will position the truck at the appropriate distance from the maintenance hole being accessed.